Urdu News Coverage on Heritage Foundation of Pakistan’s Denso Hall Rahguzar Scheme in Mariott Road.
https://www.urdunews.com/node/522041?fbclid=IwAR1oOoy2M8lFKDVuDIfrK2273eGSFPW3gK6mEAGtim84rcSvSq42ip0IVRY
posted 4y ago
On November 18th, 2020, site work on Mariott road continues. Four new manholes are installed by KWSB and the process of covering underground cable trenches with bamboo panels has been initiated.
On November 24th, 2020, the DMC Douth Team is carrying out removal of existing pavement as well as any steps or floors that are built / projected out of the building lines. All residents and shop owners have been kindly requested to cooperate with them.
posted 4y ago
On November 19th, 2020, the tile preparation and glazing took place at Makli WH, for restoration work of The Tomb of Muneer Maghfouri.
posted 4y ago
On November 11th 2020, Ar. Yasmeen Lari conducted a meeting at Denso Hall with representatives from Karachi Waterboard. They reviewed the work of water and sewerage drainage pipes that are being carried out at Mariott road.
One manhole and sub manhole has been constructed. On request of Ar. Yasmeen Lari, they have agreed on forming another two new manholes to replace two old ones.
Heritage Foundation has also started to cover the trenches and look to began working on covering the pavements with eco-friendly terracotta tiles.
posted 4y ago
On November 10th, 2020 site work at The Tomb of Mirza Jan Baba, conducted by on-site supervisor, Mommal, and local youth of Makili WH (and neighboring villages) continues on a daily basis. Local COVID-19 SOPs are being followed and implemented. Two of the youth from the documentation team, Shiblaan, and Arbaaz have had to step back but we are joined by two new members, Shakeelaa and Syed Ameer Shah.
The daily documentation is being sent to the HF office on a regular basis and is being filed and drawn up into rendered line drawings by HF‘s Hafsa Syed.
posted 4y ago